{"id":1705,"date":"2022-11-16T11:12:52","date_gmt":"2022-11-16T11:12:52","guid":{"rendered":"https:\/\/rttrans.co.rs\/nase-reference\/mpc-usce\/"},"modified":"2026-07-06T09:12:42","modified_gmt":"2026-07-06T09:12:42","slug":"mpc-usce","status":"publish","type":"nase-reference","link":"https:\/\/rttrans.co.rs\/en\/our-references\/mpc-usce\/","title":{"rendered":"MPC U\u0161\u0107e"},"content":{"rendered":"<p>RT Trans designed, manufactured, certified, and, following a trial assembly, used a gantry crane with a capacity of 15 tons (13m span and 6m height) at the MPC U\u0161\u0107e building for the transport and lifting of eight cooling units onto the roof slab.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>RT Trans designed, manufactured, certified, and, following a trial assembly, used a gantry crane with a capacity of 15 tons (13m span and 6m height) [&hellip;]<\/p>\n","protected":false},"featured_media":1706,"template":"","categories":[],"class_list":["post-1705","nase-reference","type-nase-reference","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/rttrans.co.rs\/en\/wp-json\/wp\/v2\/nase-reference\/1705","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rttrans.co.rs\/en\/wp-json\/wp\/v2\/nase-reference"}],"about":[{"href":"https:\/\/rttrans.co.rs\/en\/wp-json\/wp\/v2\/types\/nase-reference"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rttrans.co.rs\/en\/wp-json\/wp\/v2\/media\/1706"}],"wp:attachment":[{"href":"https:\/\/rttrans.co.rs\/en\/wp-json\/wp\/v2\/media?parent=1705"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rttrans.co.rs\/en\/wp-json\/wp\/v2\/categories?post=1705"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}