{"id":1681,"date":"2022-11-16T12:50:23","date_gmt":"2022-11-16T12:50:23","guid":{"rendered":"https:\/\/rttrans.co.rs\/nase-reference\/kolektor-zemun-polje\/"},"modified":"2026-07-06T08:57:34","modified_gmt":"2026-07-06T08:57:34","slug":"kolektor-zemun-polje","status":"publish","type":"nase-reference","link":"https:\/\/rttrans.co.rs\/en\/our-references\/kolektor-zemun-polje\/","title":{"rendered":"Collector \u2013 Zemun Polje"},"content":{"rendered":"<p>RT Trans carried out the lowering of a tunnel boring machine weighing 90 tons into a shaft in Zemun Polje, using two truck cranes with capacities of 120 and 100 tons working in tandem, to a depth of -10m.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>RT Trans carried out the lowering of a tunnel boring machine weighing 90 tons into a shaft in Zemun Polje, using two truck cranes with [&hellip;]<\/p>\n","protected":false},"featured_media":1682,"template":"","categories":[],"class_list":["post-1681","nase-reference","type-nase-reference","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/rttrans.co.rs\/en\/wp-json\/wp\/v2\/nase-reference\/1681","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rttrans.co.rs\/en\/wp-json\/wp\/v2\/nase-reference"}],"about":[{"href":"https:\/\/rttrans.co.rs\/en\/wp-json\/wp\/v2\/types\/nase-reference"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rttrans.co.rs\/en\/wp-json\/wp\/v2\/media\/1682"}],"wp:attachment":[{"href":"https:\/\/rttrans.co.rs\/en\/wp-json\/wp\/v2\/media?parent=1681"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rttrans.co.rs\/en\/wp-json\/wp\/v2\/categories?post=1681"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}